Solar-Powered Toilet Amenities
Project Description
An industrial logistics operation required two compact, self-contained amenities units with separate male and female facilities, integrated water storage and independent solar power. ITO delivered a matched pair of solar-powered toilet amenities units, each engineered around a steel tank-base structure and durable modular construction.
Project No: 5805 & 5806




Features included in your new solar-powered toilet amenities units
- Two matching 4.8 × 2.4 m solar-powered toilet amenities units
- Separate male and female toilet areas with partitioned cubicles
- 3,500 L water tank, 12 V pump, UV filtration and high-level alarm system
- Two 12 V, 135 W solar panels with solar inverter and regulated low-voltage lighting
- Steel tank-base structure with integrated tank platform, handrails and galvanized steps
- Stainless steel hand-wash fittings, mirrors, toilet partitions and slip-resistant vinyl flooring
- Motion-sensor internal lighting, external lighting and wall-mounted exhaust ventilation
Project Outcome
The completed pair provides a practical, self-contained amenities solution with water storage, filtration, pumping and solar electrical systems incorporated into the finished design. Finished onsite photographs record the completed external configuration and clean internal fit-out, including toilets, hand-wash facilities and partitioned cubicles.
Purpose-Built Sales Office
Project Description
ITO delivered a 96 m² modular sales office for a customer-facing sales team. The finished building combines a broad glazed entry and sheltered deck with a refined showroom and meeting environment, practical work areas, and integrated amenities. The layout was designed to support visitor engagement while providing a comfortable, professional workplace for the team.
Project No: 5570






Features included in your new sales office
- 96 m² modular sales-office configuration (12 x 8 m)
- Finished glazed frontage with sheltered entry deck
- Dedicated showroom, display and customer meeting areas
- Integrated workspace and presentation zones
- Kitchenette and powder room
- Accessible WC
- Matrix external cladding with insulated wall and ceiling construction
- Custom windows, doors, cabinetry and internal fit-out
Project Outcome
The completed sales office provides a ready-to-use, high-presentation environment that balances customer-facing display space with practical daily operations. The modular configuration brought the finished facility together as a cohesive workplace, with durable finishes, accessible amenities and a strong street-facing presence.
Custom Marketing and Display Suite
Project Description
A major international property developer required a premium, custom-designed marketing suite to showcase architectural scale models, display project material and host prospective buyers in a sophisticated, climate-controlled setting.
Project No: 5435






Features included within this project include:
- 24.0 × 8.0 m custom-engineered floor structure
- Concealed-fixed MAXLINE 340 exterior wall and roof cladding in black
- Structural automatic frameless sliding entry door with 19 mm toughened glazing
- Custom black ACP architectural entry wall and soffit treatment
- 3.0 m nominal internal ceilings with architectural recesses and feature columns
- Premium showroom lighting including 33 internal points and directional track fixtures
- Integrated kitchenette, meeting zones and accessible WC
- Dedicated Daikin VRV air-conditioning system to the main display area
Project Outcome
The completed suite provides a high-quality, purpose-built environment for immersive displays, buyer conversations and project presentations, demonstrating the design flexibility and premium finish achievable with an Instant Transportable Offices custom build.
Compact Kiosk for Retail Sales
Project Description
A visitor-focused public venue required a compact, durable kiosk that could provide a dedicated point for visitor access and service. The brief called for a purpose-designed small building that could be engineered, transported and installed as a complete solution.
Project No: 6348




Features included in the new custom kiosk
- 3.6 × 2.4 m custom kiosk engineered for Region A conditions
- Service-window arrangement with an external service ledges
- Laminated customer-service benchtops internally and soft-close base cabinetry
- Split-system air conditioning
- Structural engineering and JV3 energy-assessments
- Specified footing and tie-down systems designed for site installation
Project Outcome
Instant Transportable Offices coordinated the structural engineering and energy assessment, then supplied the specified footing and tie-down kits, transported the unit, craned it into position and completed all on-site installation works.
CASE STUDY TEMPLATE
Project Description:
In 2020 we designed the first ship loader self contained toilet block for our client, overcoming the challenges they had with operators not having ready access to facilities on the ship loaders. The clients requirements were easily met with our unique self contained waste tank technology which we incorporated into the design.
The completed solution provided a practical and reliable amenities facility that could operate independently without requiring direct sewer connections. Designed to withstand the demanding conditions of a port environment, the toilet block improved accessibility for operators while minimising disruption to daily operations. The success of the project demonstrated the effectiveness of our transportable building solutions in addressing complex site-specific challenges.






The final outcome was a small foot print self contained toilet block which featured
- Reverse cycle air-conditioning
- UV Water Filtration system
- Cyclonic Region D specification
- Fresh Water Pump
- Fresh Water Supply
- 1500L integrated waste tank
In 2025, our client approached us again to reproduce a further four of these units for an upcoming project. Following the success of the original installation, the client sought to replicate the proven design while incorporating lessons learned from operational use over the previous five years. Minor upgrades were identified based on user feedback, evolving site requirements, and advancements in available technology.
One of the key challenges was maintaining the reliability and functionality of the original design while introducing improvements without impacting the established footprint and operational requirements of the units. Our team carefully reviewed user feedback and assessed opportunities to enhance usability, durability, and long-term maintenance outcomes. The final solution retained the core self-contained waste tank technology while integrating a series of targeted upgrades, delivering a modernised version of the original design that continued to meet the client’s operational needs.
“In 2025, we were thrilled to partner once again with our esteemed client to create four additional units for their latest project. Building on the triumph of our initial installation, the client aimed to replicate the successful design while integrating valuable insights gained from five years of operational experience. Through careful analysis of user feedback and evolving site demands, we identified key enhancements that would elevate the functionality and efficiency of the units, ensuring they remained at the forefront of innovation.”